Flooded Streets Cut Off Bluegrass Lane – Fence Crisis Averted
During Hurricane Irene in 2011, floodwaters trapped residents on Bluegrass Lane near South Village Green. The rising water knocked down temporary fencing around a construction site, creating a safety hazard amid the chaos. The air smelled damp and wood splinters, with no quick way to secure the area and avoid accidents. Neighbors worried about kids and pets wandering off. The stakes were high—without a secure perimeter, emergency crews couldn’t work safely and residents were at risk.
We jumped on our trucks and dispatched the crew immediately, navigating flooded roads with our heavy-duty equipment. Using reinforced steel panels and quick-lock clamps, we rebuilt the fence perimeter within hours, restoring safety and giving emergency responders clear access. The homeowner’s relief was palpable as kids played safely again. Our fast, on-site fix kept the neighborhood secure during a critical weather emergency.
They got the fence back up fast, right when we needed it most during the flood.
Linda M., Bluegrass Lane
